ENFRDENL
5:00
↑↓ NAVIGATE · T TIMER · R RESET
NORTH  SEA FRANCE GERMANY SWITZERLAND NETHERLANDS ROTTERDAM Duisburg Cologne KAUB ⚠ Ludwigshafen STRASBOURG ◀ WE ARE HERE BASEL
LogiRhein Live
Multimodal freight disruption intelligence
FR · DE · CH · NL — ROTTERDAM → BASEL
▼  SCROLL TO BEGIN

Streamlining the corridor that moves a continent.

The corridor

1,230 km. Four countries. 285 million tonnes a year.

Barge
Rail
Road
FR · DE · CH · NL — ROTTERDAM → BASEL — 285M tonnes / year
285M
tonnes / year
40%
modal share by water
4
countries · FR DE CH NL
1
choke point: Kaub
KAUB GAUGE · JULY 2018
350 cm
Normal navigation. Full loads moving.
350 250 150 50 60 cm — safe navigation 40 cm — big barges stop
October 2018 · Kaub

Then one summer, the river disappeared.

No rain for months. Keep scrolling — and watch what every barge operator on the Rhine watched, week by week, with no forecast and no plan B.

The world's press arrived at our river.

2018 · the record
AP cutting
Associated Press KAUB · EN
A 14th-century castle at Kaub left stranded on a sandbank as the Rhine hits its lowest level on record.
24 Oct 2018 · Kaub hits record low water level · read ↗
New York Times cutting
The New York Times GERMANY · EN
The Rhine — a lifeline of Germany — crippled by drought; captains start each day with the Kaub reading.
4 Nov 2018 · Lifeline of Germany crippled by drought · read ↗
C&EN cutting
C&EN LUDWIGSHAFEN · EN
BASF shuts a Ludwigshafen plant — barges can no longer deliver its raw materials.
Nov 2018 · Low-flowing Rhine shuts plant · read ↗
US EIA cutting
US EIA ROTTERDAM / BASEL · EN
Freight rates Rotterdam → Basel jump roughly sevenfold, from ~$5 to over $35 a barrel.
Nov 2018 · Freight rates jump sevenfold · read ↗

This is what 25 centimetres looks like.

2018 · the record
Our Rhine article
+ PRESS CUTTING 1ourrhine.eu retrospective
(click to load)
New York Times article
+ PRESS CUTTING 2The New York Times
(click to load)
Business Times article
+ PRESS CUTTING 3The Business Times
(click to load)
Click any cutting to open the article in a new tab · hover and press ⇄ to swap in your own screenshot. Sources: ourrhine.eu — Low Water Crisis: When the Rhine Runs Dry ↗ · The New York Times (4 Nov 2018) · The Business Times (5 Nov 2018)
The bill
€0.0B
in industrial losses, 0.4% of German GDP — and 132 days of disrupted shipping in one year.
Force majeure declared
BASFINEOSSOLVAYARCELORMITTAL
August 2022 · Four years later
And then it happened again.
32 cm
Kaub · 15 Aug 2022
−27%
river freight · Aug 2022 vs 2021
Lowest
tonnage since reunification
2022 · the repeat
The Local cutting
The Local GERMANY · EN
Kaub falls toward the 2018 records; factories that rely on the river brace for impact.
11 Aug 2022 · Factories brace for low water impact · read ↗
taz cutting
taz BERLIN · DE
„Auf dem Trockenen" — Pegel Kaub bei nur 32 cm; Binnenschiffer können nicht mehr voll beladen.
Sep 2022 · Binnenschiffer können nicht voll beladen · lesen ↗
gCaptain cutting
gCaptain MARITIME · EN
Kaub dips to ~30 cm — many barges stop; BASF deploys special low-water vessels mid-energy-crisis.
15 Aug 2022 · many barges stop due to low water · read ↗
Fortune cutting
Fortune BUSINESS · EN
Below 40 cm the chokepoint is effectively impassable — coal for Germany's power plants reroutes to road and rail.
11 Aug 2022 · chokepoint is effectively impassable · read ↗
Read the retrospective — ourrhine.eu →

Twice in four years — and CCNR projects container throughput on this corridor falling 20% by 2050. The next low-water event is already forming. Still, nobody gets a warning.

Live · Try it on stage

You hold the river.

Drag the Kaub gauge down yourself and watch the corridor's capacity collapse. This is the cliff edge every operator lives on — and in 2018 and 2022 nobody saw it coming until they were over it.

Kaub gauge — drag it
150 cm
SURCHARGES ACTIVE
25 — 2018 record60 safe350 — normal
62%
fleet load capacity
2.1×
freight cost (vs normal)
The Gap

Three modes. Four countries. Zero shared intelligence.

How the three transport modes currently operate in disconnected silos across the corridor, making coordinated action impossible.

Barge operators

Isolated view

Track Kaub gauges individually. React when it's already too late. No predictive layer across the corridor.

Rail · SNCF / DB / SBB

Siloed networks

Operate national systems. Surge demand from barge disruptions hits them as a surprise, not a forecast.

Road / trucking

Reactive overflow

Receive overflow freight with no advance notice. Last-mile pricing chaos during disruption windows.

  • No product connects all three modes across FR/DE/CH/NL as a single intelligence layer.
  • Existing tools (Pegelonline, VNF) give current water levels — not 2–4 week predictive forecasts.
  • Port operators at Strasbourg, Basel, Rotterdam work with different systems and different languages.
  • RiverSat (EarthDaily) addresses single-mode water level forecasting only — no modal cascade intelligence.
The real problem

The water was only the trigger. The damage came from the blind cascade.

Three transport modes, four countries — and zero shared intelligence between them. In 2018 and again in 2022, each one found out the hard way, weeks apart.

DAY 0
Barge

The river drops

Operators watch the Kaub gauge individually and react when it is already too late. By the time it's critical, capacity is already gone — there is no predictive layer across the corridor.

+ DAYS
Rail · SNCF / DB / SBB

Surge hits as a surprise

Overflow demand slams national rail systems (SNCF / DB / SBB) with no forecast. Surge demand hits them as a surprise, slots sell out, and cargo queues. Three networks, three languages, no shared signal.

+ WEEKS
Road

Last-mile chaos

Trucking absorbs overflow freight with no advance notice. Last-mile pricing chaos during disruption windows causes costs to spiral exactly when shippers can least absorb them.

The cascade is predictable. The response never was. Until now.
The solution

LogiRhein Live sees it coming — 2 to 4 weeks ahead.

One intelligence layer across all three modes, built entirely on free and open European space data.

EO layer

Eyes from orbit

Sentinel-1 SAR + Sentinel-2 optical track Rhine water extent continuously — cloud-independent, free, 5-day revisit.

Climate layer

2–4 week forecast

ERA5 + Copernicus seasonal forecasts turn basin precipitation anomalies into a days-to-critical countdown.

Modal layer

Cascade modelling

SNCF / DB / SBB open APIs + road freight indices model the overflow before it materialises.

AI layer

Plain-language briefs

Trilingual (FR / DE / EN) daily disruption briefings with rerouting recommendations per cargo type.

LOGIRHEIN LIVE · DAILY BRIEF · FR/DE/EN
Under the hood

Five layers. Built in order.

From data foundation to dashboard — one pipeline, end to end. The demo you'll see is already running on layers 0 and 1.

DATA IN — AIS stream · Hub'Eau · Sentinel Hub
Built first · live

Physical infrastructure & data foundation

PostgreSQL — MMSI, positions, draughtS3 — satellite imagery cacheDocker — API + DB containers
Built second · live

Observer — logistics observatory

MapLibre GL JS — open map engineWebSockets — AISStream live feedHub'Eau — river level APISentinel Hub — EO acquisition
Built third

Data enrichment & anomaly detection

Geofencing — port terminalsData fusion — SAR × AIS correlationHydro checker — low-water alerts → rerouting
Built fourth

Intelligent resolution

AI / LLM — reasoning + language bridgeRoot cause — weather / event correlationResilience — what-if lock closuresRerouting engine
Built last

LogiRhein Live dashboard & UI

.NET + MapLibre globe frontendLive brief — trilingual FR/DE/ENTelemetry — barge status, alertsSimulation panel — rerouting control
The market

Who pays — and how much.

Segment 1

Port logistics operators

Contargo, Danser, Bolloré, Port de Strasbourg terminals — disruption forecasts for berth scheduling and rail slot pre-booking.
€800–2,000 /month
~400 Rhine operators
Segment 2

Industrial shippers

BASF, Dow, Solvay, ArcelorMittal — one disruption can halt production. Budget sits with the Supply Chain VP.
€20K–80K /year
~200 large Rhine shippers
Segment 3

Freight forwarders

DB Schenker, Rhenus — multimodal brokers rerouting cargo at short notice, currently paying spot premiums.
€300–600 /month
~5,000 EU IWT firms
01 · SaaS

Subscriptions

Free public dashboard → Pro €300–600/mo → Enterprise €2K–8K/mo with full API.

€1.2M ARR @ 50 enterprise clients
02 · Data

Licensing

Disruption feeds for commodity traders and insurance underwriters — Rhine outages move energy markets.

€200–500K recurring at scale
03 · Grants

Non-dilutive EU funding

Copernicus downstream (ESA BIC Grand Est) + TERRA Horizon Europe extension.

€150–300K runway · €0 data cost
CEF Transport Reflow Call — €1.1 billion for resilient freight corridors
Opens 18 June 2026 — next week · closes 6 Oct
Roadmap & the ask

Demo first. Pilot fast. Own the corridor.

WE ARE HERE
Phase 1 · Sprint · Q2–Q3 2026

Working MVP

  • Live on GitHub Pages
  • Kaub alert subscription demo
  • Factory 2026 + AS26 pitch
Phase 2 · Pilot · Q4 2026

First customer

  • Contargo Strasbourg pilot
  • CEF Reflow grant application
  • Sentinel-2 water layer in production
Phase 3 · Product · 2027

Full platform

  • AI briefing engine (Gemini)
  • SNCF / DB rail integration
  • Trilingual dashboard · CCNR partnership
Phase 4 · Scale · 2028+

Beyond the Rhine

  • Full cascade model live
  • 3 enterprise clients → €1M ARR
  • Rhine–Danube expansion
€500K
Pre-seed ask
To validate the platform: €120K software & AI · €100K founder buffer · €40K pilots & BD · €35K infra · €55K legal & setup. Milestones: MVP, 3–5 pilot agreements, proven 14–28-day predictive accuracy → Series Seed €1.5–3M.
13.5%
equity offered
€3.70M
post-money
The Team

The minds behind LogiRhein Live.

Business Model

Aasta

Revenue streams, pricing, market segmentation, and go-to-market strategy.

Up and Down Link

Aruna

Satellite data pipeline, EO data integration, and ground-to-platform architecture.

Strategy

Nina

Product positioning, competitive landscape, EU funding pathway, and stakeholder engagement.

Why here · Why us

Ce n'est pas un fleuve quelconque.This is our river — and we start here.

15 min from this stage

Port de Strasbourg

France's second-largest river port. We walked its terminals and spoke with port staff: no satellite or EO-based service exists there today. Our pilot customer, Contargo, operates two terminals on site.

Since 1815 · Palais du Rhin

CCNR — headquartered here

The Central Commission for Navigation on the Rhine — the world's oldest international organisation — governs this corridor from Strasbourg. Our data partner of choice sits in this city.

Built at ISU

Space, applied at home

Born in the AS26 course at the International Space University, on the TERRA Horizon Europe axis — European space data solving a European problem, starting on the river outside the window.

LogiRhein Live
« L'avenir du Rhin, livré aujourd'hui. »The future of the Rhine — delivered today.
LOGIRHEIN LIVE · FACTORY 2026 · STRASBOURG
LIVE DEMO RUNNING NOW — ASK US